Hydraulic construction

Hydraulic engineering

The BTS-MOST Group of Companies has an extensive experience building hydraulic facilities and owns modern equipment that allows:

  • performing the work in building all the types of foundations, driving in and securing metal piles;
  • performing earthwork to build embankments;
  • performing reinforcement of structures using assembled or cast-in-place concrete in water areas and on the ground.

In 2002-2003, a complex of services in construction of berth No. 3 (container) of the 1st cargo district of the Olya commercial seaport (Astrakhan Region) was completed; a grain terminal and berth at the Volga Port (Astrakhan) were built.
In 2006, construction of the rock-fill dam of Boguchansk HPP was finished.
In 2007, the BTS-MOST Group of Companies became a winning bidder to build the bank sluiceway of the Sayano-Shushenskaya HPP.
Beginning from 2007, the company has been working on the construction of Zagorsk HPSPP-2 in the Moscow Region.

The BTS-MOST Group of Companies