website about building a bridge To the Russian island

General information
Beginning of works – September 2018.
Opening to traffic – August 1, 2012.
- Total length including flyovers – 3,100 m;
- Length of the cable-stayed bridge – 1,885.53 m;
- Main span length – 1,104 m;
- Carriageway width – 21 m;
- Number of traffic lanes – 4 (2 in each direction);
- Bridge clearance – 70 m;
- Height of the pylons – 324 m;
- The longest/the shortest cable stay: 579.83 m and 135.771 m respectively;
- Number of cable stays – 168;
- Bridge layout: 60+72+3х84+1104+3х84+72+60 m.
September 2008
beginning of works
August 1, 2012
opening to traffic
1,885.53 m
bridge total length
3,100 m
length including flyovers