The state construction supervision Commission issued a permit for commissioning of the overpass in Pavlovsky Posad

Recent news
Based on the results of the inspection, the state construction supervision Commission issued a permit for commissioning an overpass across the railway in Pavlovsky Posad, near Moscow. The General contractor of the construction is USK MOST JSC, and the subcontractor is SC MOST JSC.

The 66 km PK5 overpass of the Fryazevo — Pavlovsky Posad section of the Moscow railway is one of the most complex engineering projects implemented recently in the Moscow region. As part of the project, the specialists of the SK MOST Group of companies laid a tunnel-type overpass under the railway, reconstructed two bridges over the Vohonka river on Vachevskaya street and in the Maly Railway passage, built a new 848 m-long highway, reconstructed sections of the 309 m-long highway in the Frunze passage and 679 m-long in the Bolshoy Railway passage. The overpass is 46.76 m long, 13 m wide and 5.1 m high.

The Commission worked at the facility at the end of November 2015 31 December the audit was concluded on the compliance of the built project documentation and requirements of technical regulations and issued the permit to commissioning.

The BTS-MOST Group of Companies