OJSC USK MOST Exhibited a Design of a Highway Bridge over the Zeya River at “AmurEkspoForum 2013” Exhibition Fair in Blagoveshchensk

Recent news

OJSC USK MOST exhibited a design for construction of a highway bridge over the Zeya River at the “AmurEkspoForum” International Fair that was held on June 6-8 in the city of Blagoveshchensk, Amur Region.

The USK MOST exhibit aroused great interest among the residents of Blagoveshchensk. Today Blagoveshchensk needs a bridge which will not only link reliably the residential and industrial areas to the city center, but it will also embellish the city.

OJSC USK MOST won the bid for the development of the design for construction of a bridge over the Zeya River in Blagoveshchensk. The company exhibited at the fair several cases of the bridge than could be built in the city:

  • Cable-stayed bridge with a single H-shaped pylon
  • Cable-stayed bridge with two A-shaped pylons
  • Cable-stayed bridge with a single A-shaped pylon
  • Girder bridge
  • Girder bridge having span structures with semi arch supports

The type of the bridge is to be defined later based on a review of different cases.

A total of 355 companies took part in the “AmurEkspoForum 2013” Fair. This was a major regional fair demonstrating the technological and production potentials of the best companies of the Amur region and other regions of Russia, as well as companies from Asia and Europe.

Sergej Sysoev / SK MOST

The BTS-MOST Group of Companies