During the construction of the bridge crossing over the Amur river across the Russian-Chinese border, near the cities of Blagoveshchensk and Heihe, specialists of SC Mostotrest LLC (part of the SK MOST Group of companies) successfully completed the construction of a reinforced concrete slab of the roadway of the bridge over the Kanikurganskaya Bayou. Concreting of the slab was carried out in stages, in accordance with the project.
The roadway slab is a monolithic reinforced concrete slab that combines a steel continuous span structure on top.
The total length of the bridge is 278 m (according to the scheme: 63+84+52+65 m). It will have two lanes of road transport.
The same type of foundation is used for all supports – bored piles with a diameter of 1.5 meters with a widening of the sole up to 2.5 meters in diameter.
All intermediate supports are prefabricated and monolithic. The inner part of the supports is made of monolithic reinforced concrete and lined with contour concrete blocks. After concreting the roadway slab, the bridge bed will be constructed, including: laying asphalt, installing barrier fences, lighting masts.
Work on the construction site is performed around the clock and seven days a week.
The Kanikurgansky bridge is part of the entire border road bridge crossing over the Amur river, the total length of which, together with the approaches, is almost 20 kilometers, with two-thirds located on the Russian side. The access roads to the bridge are about 11 kilometers long.