Amur River
Gratitude was expessed for the great contribution to the construction of the Blagoveshchensk-Heihe Bridge.
Vasily Orlov also thanked the builders of SK MOST for the quick repair of the bridge over the Zeya river.
The Friendship crossing is fully ready for the opening of the workers ' movement.
The main works on the Russian part of the bridge crossing the Amur river have been completed.
The laying of asphalt concrete pavement on the Blagoveshchensk-Heihe bridge has been completed.
All major works on concreting the pillars and spans of the Blagoveshchensk – Heihe road bridge have been
Round-the-clock work is underway on concreting the Blagoveshchensk - Heihe road bridge.
Specialists of the SK MOST Group installed and fixed the last span of the cross-border bridge over the
The work on the formation of the roadbed of the railway embankment on the approach from the Russian Federation
On the bridge over the canal Concurrency builders completed the device reinforced concrete slab roadway.