connected
More than 350 cubic meters of concrete were laid.
The span of the bridge over the Amur river that connected the Russian and Chinese banks was closed.
Specialists of the SK MOST Group installed and fixed the last span of the cross-border bridge over the
The tunnel builders LLC Tonnelny Otryad No. 12, Bamtonnelstroy, which is part of the SK MOST Group of