LLC Tonnelny Otryad No. 12
Traffic resumed through the Kiparisovsky Tunnel on the Far Eastern Railway, which was commissioned by
On the Western portal of the new Baikal tunnel, the Lovat RM 394DS tunneling complex is being installed
The tunnel lining has been put in place in a section that is over 600 meters long in the old Kiparisovsky tunnel.
The builders of OJSC STROY-TREST are preparing the site for construction of a new Baikal Railway Tunnel.
The tunnel builders LLC Tonnelny Otryad No. 12, Bamtonnelstroy, which is part of the SK MOST Group of