Yuri Trutnev
The bridge is 95% ready Deputy Prime Minister of the Russian Federation – Presidential Plenipotentiary
The weight of the sliding structure is 600 tons
On the new Zeya bridge and the overpass in Svobodny, the preparation work for the launching of the superstructure
The main structures of the bridge are ready, the infrastructure is being developed
The span of the bridge over the Amur river that connected the Russian and Chinese banks was closed.
An international checkpoint as part of a cross-border bridge over the Amur river near Blagoveshchensk
Rubicon LLC, which is the operator of the project to build the nizhneleninskoe bridge (Russia) — Tongjiang
The industry of the Jewish Autonomous region has been waiting for the completion of construction for 8 years.
A status report on Primorie Belt Route has reached Russian Prime Minister Vladimir Putin directly from